冷再生機(jī)施工水穩(wěn)施工常見問(wèn)題?
來(lái)源:http:/// 日期:2020-10-12
  冷再生機(jī)施工水穩(wěn)施工常見問(wèn)題
  Common problems in water stability construction of cold regenerator1.水泥平穩(wěn)砂礫石農(nóng)村基層施工時(shí),務(wù)必選用流水線作業(yè)法,使各工藝流程密不可分對(duì)接。非常是要盡可能減少?gòu)臄嚢璧竭M(jìn)行碾壓中間的延遲時(shí)間。
  1. During the construction of cement stabilized sand gravel rural base, the production line operation method must be selected to make the process flow inseparable. It is very important to minimize the delay time between mixing and rolling.
  2.應(yīng)做水泥平穩(wěn)層的延遲時(shí)間對(duì)其抗壓強(qiáng)度危害的實(shí)驗(yàn),以明確適合的延遲時(shí)間。
  2. It is necessary to test the damage of delay time of cement stabilized layer on its compressive strength, so as to determine the suitable delay time.
  3.施工期的日低溫度應(yīng)在5℃之上。
  3. The daily low temperature in the construction period should be above 5 ℃.
  4.多雨季節(jié)施工水泥平穩(wěn)層,應(yīng)需注意氣候問(wèn)題,勿使水泥和混合料遭淋雨。降水時(shí)要終止施工,但已鋪筑的水泥混合料應(yīng)盡早碾壓密實(shí)度。
  4. During the construction of cement stable layer in rainy season, attention should be paid to the climate problem, so as to avoid the cement and mixture from getting wet. The construction shall be terminated when dewatering, but the paved cement mixture shall be compacted as soon as possible.
  5.水泥平穩(wěn)固層施工時(shí),調(diào)料務(wù)必準(zhǔn)確;撒水、攪拌應(yīng)勻稱。
  5. During the construction of stable cement layer, the seasoning must be accurate; the water spraying and mixing should be even.
              冷再生機(jī)租賃
  6.嚴(yán)控農(nóng)村基層的厚度和標(biāo)高,其路拱邊坡坡率應(yīng)與整體面層一致。
  6. The thickness and elevation of rural base should be strictly controlled, and the slope rate of road arch should be consistent with the overall surface course.
  7.應(yīng)在混合料處在或略大好水分含量(氣侯酷熱干躁時(shí),農(nóng)村基層混合料可大1%~2%)時(shí)開展碾壓,直至做到≥98%密實(shí)度(超重型擊實(shí)規(guī)范),七天抗拉強(qiáng)度≥4MPa。
  7. Rolling should be carried out when the mixture is in or slightly higher moisture content (when the weather is hot and dry, the rural base course mixture can be 1% - 2%) until the compactness is ≥ 98% (super heavy compaction specification) and the seven day tensile strength is ≥ 4MPa.
  8.應(yīng)用18t之上三輪壓路機(jī)和超重型小型壓路機(jī)及膠輪壓路機(jī)碾壓。用18~32t小型壓路機(jī)碾壓時(shí),各層的夯實(shí)厚度不應(yīng)超20厘米。夯實(shí)厚度超出所述要求時(shí),應(yīng)層次攤鋪,各層的少夯實(shí)厚度為10厘米,下一層宜稍厚。應(yīng)選用先輕形、后超重型振動(dòng)壓路機(jī)碾壓。
  8. The above 18t three wheel roller, super heavy small roller and rubber tyred roller shall be used for rolling. When rolling with 18-32t small roller, the tamping thickness of each layer shall not exceed 20cm. When the tamping thickness exceeds the requirements mentioned above, it should be paved in layers. The less compacted thickness of each layer is 10cm, and the next layer should be slightly thicker. The light type vibratory roller shall be selected first and then the super heavy vibratory roller shall be used for rolling.
  9.禁止用層析減壓法開展地面找平;
  9. It is forbidden to use chromatography decompression method to carry out ground leveling;10.務(wù)必保證潮濕,不使平穩(wěn)層表層干躁,都不應(yīng)忽干忽濕。
  10. Be sure to ensure that the surface of the stable layer is not dry or wet.
  11.水泥平穩(wěn)農(nóng)村基層未鋪透層或整體面層時(shí),除施工車子可慢速度(不超過(guò)30km/h)行駛外,嚴(yán)禁一切機(jī)動(dòng)性機(jī)動(dòng)車行駛。
  11. When the cement is stable and the rural base is not paved with prime coat or overall surface course, all mobile vehicles are strictly prohibited except that the construction vehicle can drive at a slow speed (no more than 30km / h).
  12.分雙層冷再生機(jī)施工時(shí),在攤鋪?lái)攲忧埃瑧?yīng)在下一層墻頂先撒層析水泥或水泥水泥凈漿。
  12. During the construction of double-layer cold regenerator, the chromatographic cement or cement paste should be sprayed on the top of the next layer of wall before paving the top layer.
  以上是關(guān)于冷再生機(jī)施工水穩(wěn)施工常見問(wèn)題的介紹,希望對(duì)大家有所幫助,如您還有其他問(wèn)題歡迎咨詢我們的網(wǎng)站。
  The above is about the cold recycling machine construction water stable construction common problems, hope to help you, if you have other questions, welcome to consult our website.
  • 上一條:冷再生機(jī)路面養(yǎng)護(hù)中的接縫問(wèn)題該怎么處理?
  • 下一條:水泥撒布車撒布不均勻如何調(diào)試?
  • 相關(guān)產(chǎn)品:

    亚洲国产精品久久久天堂不卡海量 | 无码国内精品人妻少妇蜜桃视频| 九色电影| 无码精品A∨在线观看| 亚洲午夜精品一区二区| 平湖市| 嫩草嫩草嫩草| 大地资源网在线观看免费| 人妻熟妇乱又伦精品视频无广告| 久久免费的精品国产V∧| 少妇一级淫片免费| 色综合小说| 欧美日韩国产第一页激情| 免费无码的AV片在线观看| 51午夜精品免费视频| 久久久久久久99| 国产精品蜜臀| 欧美乱大交XXXXX| 无码成人精品区在线观看| 国产va免费精品观看精品| 亚洲区精品区日韩区综合区| 最新欧美shemale人妖护士| 亚洲综合二区| 91精品国产乱码在线观看入| 麻豆安全免费网址入口| 亚洲综合无码日韩国产加勒比| 久久久777天天躁狠狠躁av| www.东京热.com| 樱桃视频大全免费观看| 精品国产男人的天堂久久| 在线观看人成视频免费| 在线看片无码永久免费aⅴ| 国产一卡2卡三卡4卡免费网站| 天堂久久爱资源站www| 日韩私人影院| 韩国三级| 国产激情片| 精品国产亚洲第一区二区三区| 中文在线天堂网WWW| 亚洲国产中文综合专区在| 国产亚洲日韩欧美另类第八页 |